No sign-up needed

Free CHST practice test

20 questions, each with a clear explanation.

Quick PracticeQuestion 1 of 20
Your progress through this set
Hazard and Risk Identification and ControlStep 1 · Choose one answer

During design review for a four-story office building, the safety technician notices that the rooftop mechanical units are drawn close to the roof edge, so crews would install and later service them near an unprotected edge. The design team can still change the roof layout. Which change best applies safety through design?

Question review

All 20 CHST questions with explanations

Try the set above first, then use this list to review. Each answer and explanation stays closed until you open it.

  1. Question 1 · Hazard and Risk Identification and Control

    During design review for a four-story office building, the safety technician notices that the rooftop mechanical units are drawn close to the roof edge, so crews would install and later service them near an unprotected edge. The design team can still change the roof layout. Which change best applies safety through design?

    1. Specify that all rooftop installers wear personal fall arrest harnesses
    2. Add a drawing note telling contractors to train roofers on edge hazards
    3. Move the units back from the edge so the work is no longer done near it
    4. Limit rooftop installation in the schedule to calm, dry weather days
    Show answer and explanation for question 1

    Correct answer: C · Move the units back from the edge so the work is no longer done near it

    BCSP's CHST5 blueprint lists safety through design in Domain 1, and NIOSH describes Prevention through Design as building prevention into the design of equipment, operations and spaces, the stage where elimination and substitution are often easiest. Moving the units back from the edge removes the edge exposure for installation and for later servicing, so the hazard is designed out rather than managed. Harnesses are personal protective equipment, which NIOSH notes works only when workers use it correctly and consistently. A drawing note about training and a schedule limited to calm weather are administrative measures that still leave workers at the edge.

    Look for this next time: The design stage is the easiest time to eliminate a hazard, for example by keeping equipment away from roof edges.

  2. Question 2 · Hazard and Risk Identification and Control

    A drywall crew uses a solvent-based adhesive with strong vapors in rooms that have little ventilation. The supervisor finds a water-based adhesive that does the same job and plans to switch next week. Before the switch, what should the safety technician confirm?

    1. That the replacement product brings no new hazards of its own
    2. That the crew will keep wearing respirators with the new product
    3. That the old product's safety data sheet stays posted for reference
    4. That portable fans can be added so the old adhesive stays in use
    Show answer and explanation for question 2

    Correct answer: A · That the replacement product brings no new hazards of its own

    NIOSH ranks substitution second in the hierarchy of controls and says effective substitutes reduce the potential for harmful effects and do not create new risks, so the replacement's own hazards need checking before it arrives. Section 2 of its safety data sheet, Hazard(s) identification, is the place to start. Requiring respirators with the new product assumes a need before anyone has assessed it. The old product's data sheet says nothing about the new one. Adding fans so the solvent adhesive stays in use passes over a substitution that ranks above engineering controls.

    Look for this next time: Substitution helps only when the substitute is checked for new hazards before it replaces the original.

  3. Question 3 · Hazard and Risk Identification and Control

    Masons on a jobsite cut concrete block with handheld saws, and the cutting throws visible dust into their breathing zone. The block cannot be eliminated or replaced on this project. Which control should the safety technician consider first?

    1. Issue each mason a respirator and arrange fit testing this week
    2. Rotate masons so that each one spends less of the working day cutting
    3. Post signs reminding masons to stand upwind of the saw while cutting
    4. Use saws that apply water or capture dust at the blade during cutting
    Show answer and explanation for question 3

    Correct answer: D · Use saws that apply water or capture dust at the blade during cutting

    With elimination and substitution ruled out by the stem, NIOSH's hierarchy of controls points next to engineering controls, which reduce or prevent hazards from reaching workers through equipment changes and ventilation, and which control exposures without significant human interaction. A saw that wets the cut or captures dust at the blade does that. Rotating masons is an administrative control that shortens each person's exposure without reducing the dust. Upwind signs depend on every mason remembering and on the wind. Respirators are personal protective equipment, which NIOSH places last and expects when other controls cannot reduce exposure enough.

    Look for this next time: When a hazard cannot be eliminated or substituted, engineering controls at the source come before work rules and PPE.

  4. Question 4 · Hazard and Risk Identification and Control

    Two containers of sealant arrive on site. One label carries the signal word “Danger” and the other “Warning.” Under OSHA's Hazard Communication Standard, which applies to construction through 29 CFR 1926.59, what does this difference tell the crew?

    1. The “Warning” product does not need a safety data sheet on site
    2. The “Danger” product has the more severe hazard of the two
    3. The “Danger” product is a physical hazard and the other a health one
    4. The “Warning” product's label will carry no hazard statements
    Show answer and explanation for question 4

    Correct answer: B · The “Danger” product has the more severe hazard of the two

    29 CFR 1910.1200, whose requirements 29 CFR 1926.59 makes identical for construction, defines the signal word as a word that indicates the relative level of severity of a hazard: “Danger” is used for the more severe hazards and “Warning” for the less severe. A “Warning” product is still a hazardous chemical, so the employer must still have its safety data sheet in the workplace, and its label must still carry hazard statements and precautionary statements along with the signal word. The signal word grades severity; it does not tell a physical hazard from a health hazard.

    Look for this next time: On a hazard communication label, “Danger” signals a more severe hazard than “Warning”; both labels still carry hazard information.

  5. Question 5 · Hazard and Risk Identification and Control

    On a morning walk-through of a mid-rise project, the safety technician finds three problems: an uncovered floor opening beside the main path that all trades use to reach the hoist, a cracked lens on a work light inside a locked storage room, and scrap piled by a stairway that stays closed until next week. One crew is free right now. Which problem should it correct first?

    1. The work light, because electrical hazards always come before others
    2. The scrap pile, because housekeeping is the most common site finding
    3. Whichever problem takes the least time, so more items close today
    4. The floor opening, because many pass it and a fall could be severe
    Show answer and explanation for question 5

    Correct answer: D · The floor opening, because many pass it and a fall could be severe

    BCSP's CHST5 blueprint includes the skill to prioritize corrective action based on the level and frequency of risk. The floor opening sits where every trade walks, so exposure is frequent, and a fall through an opening can cause serious injury. The work light is in a locked room that few people enter, and no rule puts every electrical item ahead of every other hazard. The scrap pile is near a stairway nobody uses this week, and how often a problem shows up in inspections is not the same as how risky this one is. Fixing the quickest item first sorts by convenience rather than risk.

    Look for this next time: Rank corrections by how severe the harm could be and how often people are exposed, not by convenience or hazard type.

  6. Question 6 · Hazard and Risk Identification and Control

    A laborer runs a cutoff saw for part of the shift and then moves among several other noisy tasks around the site. The safety technician needs this worker's full-shift noise exposure. Which measurement fits that purpose best?

    1. A noise dosimeter worn by the laborer for the whole shift
    2. A one-minute sound level meter reading taken next to the saw
    3. A site noise map built from readings at a few fixed points
    4. The decibel rating the manufacturer printed on the saw
    Show answer and explanation for question 6

    Correct answer: A · A noise dosimeter worn by the laborer for the whole shift

    A personal dosimeter travels with the worker and integrates the noise from every task and location over the measurement period. In its May 2025 evaluation of cutoff saw operators at a brass foundry (HHE report 2019-0208-3408), NIOSH measured full-shift personal exposures with dosimeters whose microphones were attached to each employee's clothing between neck and shoulder, and used a handheld sound level meter for short readings near employees. A one-minute reading by the saw captures one task at one moment. A map from fixed points does not follow this worker's moves or time. A rating printed by the manufacturer describes the tool, not the laborer's day on this site.

    Look for this next time: To measure one worker's full-shift noise exposure, use a personal dosimeter; sound level meters suit short spot or area readings.

  7. Question 7 · Hazard and Risk Identification and Control

    After local exhaust ventilation is added to a cutting task, follow-up air sampling shows that the workers' exposure has dropped but is still above the exposure limit that applies to the task. No further control can be installed this week. What is the best next step?

    1. Remove the exhaust system, since it did not solve the problem alone
    2. Accept the exposure as it is, because it has gone down since the change
    3. Add suitable respiratory protection while further controls are pursued
    4. Stop sampling until stronger exhaust can be bought
    Show answer and explanation for question 7

    Correct answer: C · Add suitable respiratory protection while further controls are pursued

    NIOSH places personal protective equipment last in the hierarchy of controls but says employers must provide it when other control methods are unable to reduce the hazardous exposure to safe levels. Here the exhaust system helped but did not bring exposure below the applicable limit, so respiratory protection fills the gap while the team keeps looking for better higher-order controls. Removing the exhaust would raise exposure again. A drop in exposure does not make an exposure above the limit acceptable. Stopping sampling removes the information needed to judge whether the next control works.

    Look for this next time: PPE supplements higher-order controls when they cannot reduce exposure enough; it does not replace them.

  8. Question 8 · Emergency Preparedness, Incident Investigation, and Response

    A project falls under an OSHA standard that requires an emergency action plan. The contractor's written plan lists escape routes, the alarm signal, and how to report a fire, but it never says how supervisors will confirm that everyone got out. Under 29 CFR 1926.35, what must be added?

    1. A map of the nearest hospital and the fastest driving route to reach it
    2. A procedure to account for all employees after evacuation is complete
    3. A sign-in sheet at the gate that visitors fill in on arrival
    4. A rule that the last worker out locks the main site entrance
    Show answer and explanation for question 8

    Correct answer: B · A procedure to account for all employees after evacuation is complete

    29 CFR 1926.35 applies to emergency action plans required by a particular OSHA standard, and it lists procedures to account for all employees after an emergency evacuation has been completed among the minimum elements, alongside escape procedures and routes, the preferred means of reporting emergencies, and contacts for the plan. A hospital map is not one of those elements and tells no one who is still missing. A visitor sign-in sheet leaves out the workers themselves. Locking the entrance after the last worker leaves does not produce a headcount and does nothing to show who has not come out.

    Look for this next time: An emergency action plan needs a way to account for every employee after evacuation, not only routes and alarms.

  9. Question 9 · Emergency Preparedness, Incident Investigation, and Response

    A site works under an emergency action plan that an OSHA standard requires. The same air horn blast is used both to warn of crane loads moving overhead and to order an evacuation. What does 29 CFR 1926.35 require for the alarm?

    1. A distinctive signal for each purpose the alarm system serves
    2. One shared signal, so every worker learns one sound
    3. A note in the written plan explaining that the signal is shared
    4. A separate alarm system for each contractor working on the site
    Show answer and explanation for question 9

    Correct answer: A · A distinctive signal for each purpose the alarm system serves

    29 CFR 1926.35 says that if the employee alarm system is used for alerting fire brigade members or for other purposes, a distinctive signal must be used for each purpose, and the alarm system must comply with 29 CFR 1926.159. A blast that means both “load overhead” and “get out” leaves workers unsure which order they heard. Explaining the shared signal in the written plan documents the confusion without removing it. Nothing in the rule asks for one alarm system per contractor, and several systems on one site could add to the confusion instead of ending it.

    Look for this next time: Each purpose of a site alarm needs its own distinctive signal, so an evacuation order is never mistaken for a routine warning.

  10. Question 10 · Emergency Preparedness, Incident Investigation, and Response

    A fire breaks out in a building under construction. The site's emergency coordinator has started the evacuation under the site plan and is checking the headcount when the fire department arrives and its officer takes command of the incident. What should the coordinator do next?

    1. Keep directing the site crews separately so the evacuation is not slowed
    2. Leave the scene to call the project owner and the insurance carrier
    3. Wait until the officer asks before passing on any site information
    4. Brief the officer on the headcount, known hazards and the site layout
    Show answer and explanation for question 10

    Correct answer: D · Brief the officer on the headcount, known hazards and the site layout

    FEMA's Incident Command System review document (March 2018, drawn from the ICS 300 course) says that when command transfers, the transfer includes a briefing that captures essential information for continuing safe and effective operations, and that unity of command means each individual reports to only one person, which reduces conflicting directives. Briefing the officer on the headcount, known hazards and layout hands over what the site knows. Directing crews separately creates a second line of orders. Calling the owner and insurer can wait and takes the coordinator away. Waiting to be asked delays information the officer needs now.

    Look for this next time: When responders take command, the site hands over what it knows in a briefing and then works within one chain of command.

  11. Question 11 · Emergency Preparedness, Incident Investigation, and Response

    A general contractor runs its first evacuation drill on a large site. Most crews reach the assembly area quickly, but two subcontractor crews working in a noisy basement never hear the alarm. What should happen after the drill?

    1. Record that the drill was held as planned and close out the drill file
    2. Discipline the two foremen whose crews missed the evacuation
    3. Evaluate the drill, record what failed, and assign corrective actions
    4. Run the same drill again tomorrow without changing anything
    Show answer and explanation for question 11

    Correct answer: C · Evaluate the drill, record what failed, and assign corrective actions

    FEMA's Homeland Security Exercise and Evaluation Program (HSEEP) describes exercise evaluation as assessing the ability to meet exercise objectives, with strengths, areas for improvement and corrective actions documented in an After-Action Report/Improvement Plan, and improvement planning as the way organizations take the corrective actions needed to improve plans. An alarm that two crews could not hear is exactly such an area for improvement. Closing the file wastes what the drill revealed. Disciplining the foremen blames people for a gap in how the alarm reaches the basement. Running the drill again unchanged is likely to repeat the same failure.

    Look for this next time: A drill pays off when its weaknesses are evaluated, written down and turned into assigned corrective actions.

  12. Question 12 · Safety Program Development, Implementation, and Sustainment

    A contractor's monthly safety report to its executives lists only recordable injuries and workers' compensation costs. The executives want a measure that shows whether prevention work is happening before anyone gets hurt. Which measure should the safety technician add?

    1. The number of lost-workday injuries recorded each month
    2. The share of planned hazard assessments completed each month
    3. The total cost of workers' compensation claims for the whole year
    4. The number of first-aid cases treated on site each month
    Show answer and explanation for question 12

    Correct answer: B · The share of planned hazard assessments completed each month

    A NIOSH Science Bulletin of July 7, 2022 describes injury counts and costs as lagging indicators that rely on adverse outcomes that have already happened, and leading indicators as factors that occur in advance and measure activities, practices and programs for preventing injuries; in the study it reports, hazard assessments were the stronger leading indicator. The share of planned hazard assessments completed shows prevention work as it happens. Lost-workday injuries, claim costs and first-aid cases all count harm after the fact, so adding them would leave the report looking only backward.

    Look for this next time: Leading indicators track prevention activity, such as completed hazard assessments; injury counts and costs are lagging indicators.

  13. Question 13 · Safety Program Development, Implementation, and Sustainment

    A subcontractor's site safety plan commits to frequent and regular inspections of the job site, materials and equipment. Under OSHA's general safety and health provisions for construction, who should the employer designate to carry them out?

    1. The owner's architect, during the monthly progress meetings
    2. Any newly hired laborer who has finished the site's safety orientation
    3. The insurance carrier's loss-control visitor, once each year
    4. A competent person able to spot hazards and correct them promptly
    Show answer and explanation for question 13

    Correct answer: D · A competent person able to spot hazards and correct them promptly

    29 CFR 1926.20(b)(2) says accident prevention programs shall provide for frequent and regular inspections of the job sites, materials and equipment by competent persons designated by the employer, and 29 CFR 1926.32(f) defines a competent person as one capable of identifying existing and predictable hazards and authorized to take prompt corrective measures to eliminate them. The architect is neither the employer's designee nor on site often enough. A new laborer who has only finished orientation has not shown that capability or been given that authority. A once-a-year insurance visit is neither frequent nor regular.

    Look for this next time: Site inspections belong to a competent person who can recognize hazards and has the authority to fix them promptly.

  14. Question 14 · Safety Program Development, Implementation, and Sustainment

    During an inspection, the safety technician finds a portable extension ladder with a split side rail. Ladder work is scheduled all afternoon, and there is no spare ladder on site. What should happen to the damaged ladder?

    1. Tag it “Do Not Use” and withdraw it from service until it is repaired
    2. Keep it for short climbs only while a replacement ladder is ordered
    3. Wrap the split rail with tape and let only experienced workers use it
    4. Note the split rail in the inspection log for the next safety meeting
    Show answer and explanation for question 14

    Correct answer: A · Tag it “Do Not Use” and withdraw it from service until it is repaired

    29 CFR 1926.1053(b)(16) says portable ladders with structural defects, including broken or split rails, must immediately be marked as defective or tagged “Do Not Use” or with similar language, and withdrawn from service until repaired; 29 CFR 1926.20(b)(3) likewise prohibits using equipment that does not comply with an applicable requirement. The afternoon schedule does not change that. Short climbs still load the damaged rail. Tape does not repair a split rail, and experience does not make a defective ladder safe. Logging the defect for a later meeting leaves the ladder available in the meantime.

    Look for this next time: Defective equipment is marked or tagged and taken out of service at once; schedule pressure does not change that.

  15. Question 15 · Safety Program Development, Implementation, and Sustainment

    On a construction project, two OSHA provisions appear to cover the same work practice: a general provision and a standard written specifically for that practice. Their requirements differ. Under 29 CFR 1926.20(d), which one governs the practice?

    1. The general provision, because it covers a wider range of work
    2. The specific standard, which prevails over a different general one
    3. Whichever is stricter, as chosen by the site superintendent
    4. Whichever of the two was added to the regulations most recently
    Show answer and explanation for question 15

    Correct answer: B · The specific standard, which prevails over a different general one

    29 CFR 1926.20(d)(1) says that if a particular standard is specifically applicable to a condition, practice, means, method, operation or process, it prevails over any different general standard that might otherwise apply. Under 1926.20(d)(2), a general standard still applies according to its terms where no particular standard applies, so its broader reach does not let it override the specific one. The rule does not leave the choice to a superintendent's view of which is stricter, and it does not rank provisions by when they were added to the regulations.

    Look for this next time: When a specific OSHA construction standard covers a practice, it prevails over a different general one.

  16. Question 16 · Safety Program Development, Implementation, and Sustainment

    A crew rents a walk-behind concrete saw model it has never used before. The foreman says the crew has run other saws for years, so the manual can stay in the truck. What should the safety technician do before the saw is used?

    1. Let the crew start, since years with other saws cover any model
    2. Ask the rental yard to swap it for a saw of a brand the crew knows
    3. Review the manufacturer's manual for this model's directions and limits
    4. Have the crew run the saw briefly and report any problems they find
    Show answer and explanation for question 16

    Correct answer: C · Review the manufacturer's manual for this model's directions and limits

    BCSP's CHST5 blueprint lists, in Domain 3, proper equipment use and the importance of referencing manufacturers' manuals and incorporating the directives, recommendations or options found in them. 29 CFR 1926.20(b)(4) also allows only employees qualified by training or experience to operate equipment, and experience on other saws does not show that the crew knows this model's directions. Starting without the manual assumes every model works the same way. Swapping brands sidesteps the issue, and any replacement saw would have its own manual. A trial run invites the very problems the manual is written to prevent.

    Look for this next time: Before using unfamiliar equipment, check the manufacturer's manual for that model's directions and limits.

  17. Question 17 · Leadership, Communication, and Training

    A drywall subcontractor's crew arrives at a hospital renovation where parts of the building stay occupied and live utilities run above the ceilings. The crew watched a general construction safety video at their company last year. What training does the crew need before starting work?

    1. Instruction on this site's hazards and how to avoid them in their work
    2. None, since the company video already covered construction safety
    3. A copy of the site rules for each worker to read during breaks
    4. The same general video again, played at the start of every week
    Show answer and explanation for question 17

    Correct answer: A · Instruction on this site's hazards and how to avoid them in their work

    29 CFR 1926.21(b)(2) requires the employer to instruct each employee in the recognition and avoidance of unsafe conditions and the regulations applicable to the employee's work environment, and BCSP's CHST5 blueprint includes developing site-specific safety training requirements based on job tasks and work environment. Occupied areas and live utilities above the ceilings are conditions of this site that a general video did not cover. Handing out the site rules to read alone does not instruct the crew in recognizing those hazards. Replaying the same general video each week repeats content that never addressed this site.

    Look for this next time: Training starts from the hazards of the actual site and tasks, not from a generic course taken elsewhere.

  18. Question 18 · Leadership, Communication, and Training

    A site's emergency action plan, required by an OSHA standard, names evacuation assistants for each floor. A carpenter has just been designated as the evacuation assistant for the third floor. Under 29 CFR 1926.35, when must the plan be reviewed with this carpenter?

    1. At the next annual safety meeting held for all crews on site
    2. Only if the written plan itself is revised during the project
    3. Whenever the carpenter asks the superintendent for a copy
    4. Now, because the carpenter's designated actions have changed
    Show answer and explanation for question 18

    Correct answer: D · Now, because the carpenter's designated actions have changed

    29 CFR 1926.35(e)(2) requires the employer to review the plan with each covered employee when the plan is developed, whenever the employee's responsibilities or designated actions under the plan change, and whenever the plan changes; paragraph (e)(1) also requires evacuation assistants to be designated and trained. The new assignment is a change in designated actions, so the review is due now. An annual meeting is not a trigger in the rule. A revision of the plan is a separate trigger, not the only one. Waiting for the carpenter to ask shifts the employer's duty onto the worker.

    Look for this next time: Review the emergency plan with a worker whenever that worker's role in it changes, as well as when the plan changes.

  19. Question 19 · Leadership, Communication, and Training

    Crews on a large project have worked six-day weeks with long shifts for months, and supervisors report more near misses late in the day. The company's only health effort is a gym discount. Which response best fits NIOSH's Total Worker Health approach?

    1. Extend the gym discount so that it covers workers' families too
    2. Review shift lengths and schedules alongside the site's hazard controls
    3. Remind workers to sleep more and leave the schedule unchanged
    4. Treat the late-day near misses as personal errors and coach them
    Show answer and explanation for question 19

    Correct answer: B · Review shift lengths and schedules alongside the site's hazard controls

    BCSP's CHST5 blueprint lists recognizing and addressing total worker health in Domain 4. NIOSH defines Total Worker Health as policies, programs and practices that integrate protection from work-related safety and health hazards with the promotion of injury and illness prevention efforts to advance worker well-being, and it lists work arrangements and work organization among its priority issues. Reviewing shift lengths and schedules together with the site's hazard controls addresses a work-organization factor the employer controls. A wider gym discount and advice to sleep more put the burden on individuals and leave the schedule as it is. Treating the near misses as personal errors ignores what the work arrangements may contribute.

    Look for this next time: Total Worker Health looks at how work is organized, such as schedules, together with hazard controls and well-being.

  20. Question 20 · Leadership, Communication, and Training

    A painting crew that completed the site's hazard communication training will start using a new coating next week. Its safety data sheet lists a hazard that none of the crew's earlier training covered. Under OSHA's Hazard Communication Standard, what is required?

    1. Nothing new, since the crew already finished hazard communication training
    2. Only adding the new safety data sheet to the site's binder of data sheets
    3. Training on the new hazard when the coating reaches their work area
    4. Covering the new hazard at the crew's next annual refresher session
    Show answer and explanation for question 20

    Correct answer: C · Training on the new hazard when the coating reaches their work area

    29 CFR 1910.1200(h)(1), whose requirements 29 CFR 1926.59 makes identical for construction, requires effective information and training at the time of initial assignment and whenever a new chemical hazard the employees have not previously been trained about is introduced into their work area. The new coating brings such a hazard, so the earlier training does not cover it. The safety data sheet must be available, but availability is not training. An annual refresher is not the trigger the standard uses, and waiting for it would leave the crew working with a hazard nobody has trained them on.

    Look for this next time: A chemical hazard the crew has not been trained on triggers hazard communication training when it reaches their work area.

Use the sample well

The rationale matters more than the score.

A short set can show you what deserves another look. A strong run shows you can read a construction safety scenario and pick the control, plan step, or training decision a safety technician would defend. Twenty questions are a small sample, so the result does not predict a pass on the CHST exam.

01

Answer before reviewing

Choose the one best answer for the scenario as written. Then read why each other option falls short.

02

Read every rationale

Confirm why the best option fits, even when you were right.

03

Follow the pattern

Use recurring misses—not one score—to choose your next focus.